Solar installation evidence, ready for handover.
Collect the six solar checklist photos, resolve office corrections and prepare a customer evidence packet. For example, the office can request a clearer inverter nameplate photo. Recapture the full checklist in a linked package; the earlier submission remains in history. Built-in checklists are generic starting points. Required means required by the selected checklist. Confirm any additional customer or reviewer requirements. WorksiteProof does not guarantee inspection, utility, financing or rebate acceptance.
Demonstration photo checklist
- Service Panel Overview
Show the complete service panel and surrounding working area.
- Busbar and Main Breaker Ratings
Capture legible busbar and main-breaker ratings in one or more clear photos.
- Inverter Nameplate
Capture manufacturer, model, serial number, and electrical ratings.
- Rapid Shutdown and Warning Labels
Show installed placards and warning labels in their final locations.
- Array and Wiring Overview
Show the completed array, visible wiring methods, and equipment placement.
- Meter and Interconnection Point
Show the meter area and completed point of interconnection.
Only capture equipment when safe and authorized. Do not expose energized equipment for a photo.
Questions and answers
What photos are in the Residential Solar Closeout checklist?
The demonstration checklist calls for: Service Panel Overview; Busbar and Main Breaker Ratings; Inverter Nameplate; Rapid Shutdown and Warning Labels; Array and Wiring Overview; Meter and Interconnection Point. Built-in checklists are generic starting points. Required means required by the selected checklist. Confirm any additional customer or reviewer requirements. WorksiteProof does not guarantee inspection, utility, financing or rebate acceptance.
How do corrections and handoff work?
Submit for internal office review, resolve corrections with a new full-checklist package, then approve and release the current package. Download the submitted PDF and send it yourself. Internal approval and release are separate dated records; they do not change the submitted PDF or record recipient acceptance.
Can I capture without cell service?
Open and set up the job while connected. Capture can be saved on this device when service drops; keep the app’s storage intact until sync completes. Browser storage can be cleared or exhausted.