Inspect a submitted solar evidence packet

Synthetic demonstration only. The same packet renderer produces this six-illustration sample. No customer data or verified work; GPS and weather are marked missing.

Synthetic sample packet

Download synthetic sample PDF

SYNTHETIC DEMONSTRATION. Illustrations show packet layout, not actual equipment or verified work. Example correction: replace an unreadable inverter nameplate in a new full-checklist package. Internal approval and release are separate dated records. This packet does not certify compliance.

Created: 2026-10-21T12:00:00.000Z. Site: Synthetic site; no real address. GPS and weather: not captured. No approval or release asserted.

  1. Service Panel Overview

    Show the complete service panel and surrounding working area.

    No external reviewer verified

  2. Busbar and Main Breaker Ratings

    Capture legible busbar and main-breaker ratings in one or more clear photos.

    No external reviewer verified

  3. Inverter Nameplate

    Capture manufacturer, model, serial number, and electrical ratings.

    No external reviewer verified

  4. Rapid Shutdown and Warning Labels

    Show installed placards and warning labels in their final locations.

    No external reviewer verified

  5. Array and Wiring Overview

    Show the completed array, visible wiring methods, and equipment placement.

    No external reviewer verified

  6. Meter and Interconnection Point

    Show the meter area and completed point of interconnection.

    No external reviewer verified

Submitted record SHA-256: 05dddc6c175b8a90b53399568906040155b865981d687b0d7e90168cfbdfd64e

Questions and answers

What is included in a WorksiteProof sample compliance report?

The downloadable synthetic solar packet contains six labeled illustrations, notes, missing GPS and weather status, a submitted time, requirement provenance and digests. It demonstrates layout, not verified installation evidence.

Can a WorksiteProof report be shared with utilities, inspectors, or financing partners?

Download the submitted PDF and send it yourself. Internal approval and release are separate dated records; they do not change the submitted PDF or record recipient acceptance. Anyone with an enabled seven-day link can view the selected summary; photos are opt-in. Confirm each recipient’s requirements.

Does the sample report replace code inspection or licensed review?

No. The report organizes field evidence and audit history. It does not replace licensed electrical judgment, utility approval, or official inspection authority.