Document the panel upgrade from initial condition to final labels.

Collect five panel upgrade checklist photos with notes, available site context and an evidence packet. For example, the office can request a legible final directory photo. This checklist does not perform load calculations or certify bonding, grounding or workmanship. Built-in checklists are generic starting points. Required means required by the selected checklist. Confirm any additional customer or reviewer requirements. WorksiteProof does not guarantee inspection, utility, financing or rebate acceptance.

Demonstration photo checklist

  1. Pre-Upgrade Condition

    Show the original service equipment before work begins.

  2. Busbar and Main Breaker Ratings

    Capture legible final busbar and main-breaker ratings.

  3. Bonding and Grounding

    Show final bonding and grounding electrode connections.

  4. Conductor Terminations

    Show completed service and feeder terminations before covers are installed.

  5. Panel Directory and Labels

    Show the completed directory, equipment labels, and final closed panel.

Only capture equipment when safe and authorized. Do not expose energized equipment for a photo.

Questions and answers

What photos are in the Main Panel Upgrade Closeout checklist?

The demonstration checklist calls for: Pre-Upgrade Condition; Busbar and Main Breaker Ratings; Bonding and Grounding; Conductor Terminations; Panel Directory and Labels. Built-in checklists are generic starting points. Required means required by the selected checklist. Confirm any additional customer or reviewer requirements. WorksiteProof does not guarantee inspection, utility, financing or rebate acceptance.

How do corrections and handoff work?

Submit for internal office review, resolve corrections with a new full-checklist package, then approve and release the current package. Download the submitted PDF and send it yourself. Internal approval and release are separate dated records; they do not change the submitted PDF or record recipient acceptance.

Can I capture without cell service?

Open and set up the job while connected. Capture can be saved on this device when service drops; keep the app’s storage intact until sync completes. Browser storage can be cleared or exhausted.